TheGridNet
The Honolulu Grid Honolulu

Tutor Perini expands Honolulu footprint with $53M design change order

Tutor Perini Corporation (TPC) has been awarded a $53 million change order for the ongoing City Center Guideway and Stations project in Honolulu. This contract modification is a major development, authorizing the company to begin the design phase for a

Tutor Perini expands Honolulu footprint with $53M design change order

Pubblicato : 8 mesi fa di Meghavi Singh in Finance

Tutor Perini Corporation (TPC) has been awarded a $53 million change order for the ongoing City Center Guideway and Stations project in Honolulu.

This contract modification is a major development, au... [268 symbols]


Temi: Markets

Read at original source